Skip to content

AFIR for your public chargers.

The EU regulation sets rules for payment, prices and data at every charger the public can use. Plugchoice monitors and controls your chargers over OCPP, next to the back office that takes payment.

What AFIR asks of a public charger

AFIR has applied since 13 April 2024 to every charger the public can use, also on private ground such as the car park of a shop or a hotel.

RuleFromIn Plugchoice
Pay without a contractNew chargers take a card reader or contactless payment, and below 50 kW a QR code may do. From 1 January 2027 this also holds for older chargers from 50 kW along the TEN-T road network or in a safe and secure parking area.13 April 2024Through your back office. Plugchoice Billing is planned for the fourth quarter of 2026.
The price before the sessionFrom 50 kW, new chargers show a price per kWh, plus any fee per minute for staying too long. Below 50 kW, new chargers make every part of the price available at the charger, per kWh first, then per minute, per session and any other.13 April 2024Through your back office.
Digitally connectedEvery public charger sends and receives data in real time and can be monitored and controlled from a distance, including starting and stopping a session and measuring the electricity.14 October 2024Live status, remote start and stop, and the energy of every session, over OCPP.
Capable of smart chargingChargers installed after 13 April 2024, and chargers renovated after 14 October 2024, can adjust their current in real time.13 April 2024The charger. Smart Charging then adjusts its current in real time.
Open dataData such as location, connectors and power, plus status, availability and the ad hoc price, through a free API registered with the national access point.14 April 2025Through your back office.
A fixed cable on DCEvery public DC charger has its charging cable attached.14 April 2025The charger.
ISO 15118 between car and chargerNew and renovated public chargers speak ISO 15118-2, and from 1 January 2027 also ISO 15118-20.8 January 2026The charger.

Monitored and controlled from your desk

Plugchoice reads every charger over OCPP and sends its commands from the web portal.

  • Live status per connectorAvailable, Charging or Faulted, translated from each brand's own codes.
  • Start and stop remotelyEnd a session or release a cable without going to the charger.
  • The energy of every sessionEach transaction with its start, end and kWh.
  • Every OCPP message keptFilter and export the log of each charger.

Smart charging on new and renovated chargers

Smart Charging adjusts the current of each charger in real time over OCPP, on chargers that support it. How smart charging works

  • A limit per groupGive each part of a site its own limit under the main fuse.
  • Power for the cars that chargePlugchoice divides the power between the cars that are charging at that moment.
  • What the building leavesWith a meter on the main connection, the chargers use the power the building does not.

Payment, prices and data through your back office

Plugchoice can pass the charger's connection on to the back office you already use. The back office that takes payment, sets prices and serves the open data can stay connected to every charger. How the connection is shared

  • Your back office billsIt authorizes each session and takes the payment.
  • Nothing lost when it is offlinePlugchoice holds its messages and sends them on when it is back.
  • Switch without a visitAdd or drop a back office. The chargers stay online.
  • Plugchoice Billing, plannedA payment terminal, a QR code and charge cards from other providers, from the fourth quarter of 2026 in the countries our payment partner covers. About Billing

AFIR in the news

  1. Munich court bars EWE Go from charging roaming provider DCS more than its own app customers

    The Landgericht München I ruled on 6 October 2026 (case 33 O 2062/25) that charge point operator EWE Go may not charge the roaming provider Digital Charging Solutions (DCS) more per kWh than it charges its own contract customers. DCS runs charging services for BMW and Mercedes-Benz and is a joint venture of BMW, Mercedes-Benz and BP.

    Sources: electrive.net, "Wegweisendes Urteil: EWE Go soll DCS nur die Preise für Vertragskunden berechnen", 6 October 2026. electrive.com, "Landmark ruling: EWE Go must offer DCS same prices as end customers", 7 October 2026.

  2. Easee trims its EU range to two chargers, and points at AFIR and ISO 15118 as the reason

    Easee announced on 23 September 2026 that it is narrowing its EU charger range to two models: Charge Max for home use and Charge Pro for larger sites. Charge Core and Charge Up are being discontinued in EU markets, with a last-buy date of 31 October 2026 and full phase-out by 31 December 2026. The previously announced Charge Up2 will not launch at all. Norway and Switzerland sit outside the timeline and keep Charge Up; the UK range is unaffected.

    Sources: Easee, "Easee streamlines its EU charger range to two products, ending the guessing game on AFIR and ISO 15118", 23 September 2026.

  3. Plug and Charge arrives on AC chargers, and it is a backend feature now

    Chargecloud, a Cologne-based charge point management vendor, announced at the Intercharge Network Conference in Berlin on 1 September 2026 that it has integrated Hubject's Plug and Charge public key infrastructure into its own management system. Operators running on Chargecloud get the feature without doing an integration themselves. Until now Plug and Charge has largely been a DC fast-charging story; this puts it on AC points, which is where most charging actually happens.

    Sources: electrive.com, all-about-industries.com.

Questions about AFIR

If the public can use it, yes, also on private ground such as the car park of a shop or a hotel. A charger at home or in a car park only your own staff can enter is not publicly accessible.

No. AFIR places its duties on the operator, and they cover the charger, the payment terminal and the back office. Plugchoice monitors and controls the charger over OCPP and, with Smart Charging, adjusts its current, next to the back office that takes payment.

Today through the back office you connect, if it offers it. Plugchoice Billing, with a payment terminal, a QR code and charge cards from other providers, is planned for the fourth quarter of 2026, in the countries our payment partner covers.

Plugchoice can pass the connection on to 300+ back offices on our integration list. See the back offices

Chargers of 348 brands work with Plugchoice, depending on model, software version and settings. The charger list shows which models support Smart Charging. See the charger list

The platform is free for every charger, location and user. Smart Charging is €29 a year per AC socket, €89 for five years or €199 once, and a DC socket counts three times. Prices include VAT. See pricing

Start in the web portal

Create a free account, point a charger at wss://ocpp.plugchoice.com and it appears in the portal.

Free platformOCPP 1.6J chargersHosted in the EU

Charging at home? Get the app.